Energy Valley
SNN
25 mrt
Teams from A and B-class can pick up their solar panels

Teams from A and B-class can pick up their solar panels

Teams from A and B-class can pick up their solar panels

  • Posted by frisiansolar, 25. maart 2010
  • Posted in: News

The weather is getting better and the solar panels are on their way. It’s almost time to start testing the solar boats. The registration for the Frisian Solar challenge 2010 has been closed. On a short-term teams from A and B-class can pick up the solar panels, supplied by The Sun Factory. To get these panels step 2 till 4 must be completed and approved.

On Monday the 12th of April, Monday the 3rd of May and on Thursday the 27th of May teams can pick up the solar panels between 13.00 and 17.00 o’clock. Teams from abroad The Netherlands will receive the solar panels when they arrive at the camping site in Holland. The first camping site opens his doors on Wednesday the 30th of June. The exact time to pick up the solar panels at this date will be published as soon as possible.

Give your opinion